Provide customer with turnkey solution for plastic molding line.
2015年10月6日星期二
2015年9月28日星期一
PET Preform packing mould|plastic bottle prefrom mould manufacture-Sinomould
Over more than 20 years Sino mould has been committed to PET bottle,bottle, plastic bottle cap mould research and manufacturing,rely on constant innovation and improve,employment and enjoys a high reputation.The company as the leading enterprise in bottle preform mould technology,with Germany,Japan and other advanced processing technology,focus on the international mold manufacturing standards,high quality, high efficiency every detail in the completion of the injection mold making,has been set up and perfect a set of suitable for bottle preform mould research and development,production,sales and service management system,brought together a group of outstanding design,production, processing personnel,we believe that good management and the extraction of talent is a top-class products.
We are specialized in the production of needle valve mould,do not need artificial cut gate.The use of advanced hot runner system,guarantee the products AA values at a low level.Reasonable cooling channel design,strengthened the mould cooling effect,effectively shorten the molding cycle.Adopt original imported Germany Hotset.The control electric box adopts German intelligent temperature controller (PID control uninterruptible power supply).The temperature control box can be custom made according to customer requirements or regulating control electric box.
Professional after-sales service engineering and technical personnel,good brand reputation,guarantee the stability of mould machine running.Avoid cut gate, reduces the labor intensity of workers.let each customer satisfaction.After-sales service provide for you forever until after the completion of the plastic mold life termination.
Tina
Mail:serve@sinomould.com
Skype:anole-01
2015年9月26日星期六
Plastic cap mould manufacture|flip cap injection mould-Sino mould
Sino mould can provide 1 to
128 cavities bottle cap mould.Manufacturing cap moulds contains:mineral water
cover, cover, 5 gallon cover,jelly bottle,shampoo flip.All kinds of oil bottle
lid,sports cap,cosmetics, beer cap and barrel cover,and etc.
Usually the cavities for
cap mould hot runner system has 6、8、12、16、24、32、48、64、and Sino mould with good
hot runner system manufacturers will have the ability to produce cap mould hot
runner system with 72、96、128cavities.
Mould feature:
Mould name flip top cap
Mould system:Hot runner
Ejection:automatic flip top
close,fully automatic drop
Mould life:10 millon shots
Mould material:starvax S420
for core and cavity,P20 for mould base.
Sino mould specialize in all
kinds of plastic bottle cap mould,cosmetics cap mould,plastic mould,plastic
bottle cap mould,plastic mould, zinc aluminum alloy mold company, plastic
mold;Cosmetics bottle cap mould away, health care products cover mould, auto
mould, commodity mould of professional manufacturers.The pursuit of customer
satisfaction is our greatest responsibility, the pursuit of excellence
perfection, our purpose is to welcome your inquiry at any time.
Sino mould contacts:Tina
Skype:anole-01
Mail: serve@sinomould.com
2015年9月21日星期一
Bumper mould manufacture|auto bumper mould-sinomould
Modern car’s front and rear
bumpers adopt plastic as raw material, not only can keep the function of
protection, but also has with the harmony and unity of the body shape,
lightweight, reduce fuel consumption, etc.Sino auto bumper mould
Bumper plastic choice,must satisfy the several aspects like a good use of performance requirements, process performance requirements and reasonable cost requirements.When choosing modified PP materials, shall meet the following four basic characteristics:
First, good heat resistance, then this range (80-100 ℃)
Second, the impact strength should be controlled in (0.3-4)J*cm²
Third, the scope of the tensile strength by 29 Mpa
Fourth, good formability and weather resistance.
Chinese mould made by sino-Bumper thickness range is generally (3 +) 0.25
mm - (3.5 + 0.25) mm. The design, with enough variation in thickness transition
zone to avoid impact parts surface quality of the thickness of the change of purpose.Ejection
Angle should be greater than zero.Car front bumper is a safety device, capable
of absorbing and buffer the impact to protect the front car body.The bumper is
a safe, and decoration, its structure design is closely related to the vehicle
safety, not only the vehicle quality perception.
2015年9月19日星期六
Installation for the mould-plastic injection mould installation steps-sinomould
Customer most less care for the mould installation,that maybe caused some wear for the mould demage.
Today lets share with you a detail steps for the mould installation on plastic injection mould.We are professional in this field,Below is the steps:
1. Mould installation
1) Clean the mould plate locating ring and the mould installation surface dirty parts or flash.
2) Since the mould not very big,we adopt the whole sets installation method.First set two wooden plate at the machine mould installation downside.mould installation at the machine plate,Fixed side mould location ring should be set well.Then close the mould,Use the mould clamp fix the mould on the machine mould plate.Fix the moving side on the machine mould plate.
3) Adjust the mould clamp system,ensure the enough mould open distance and the clamp force,keep suitable mould close state.
4) Slow to open the mould plate until the mould plate stop moving back,adjust the eject device,keep the eject distance.Open mould to check the eject structure moving situation,whether balance or stable.
5) After mould installation,wait the injection machine barrel and nozzle reach to 20-30℃,adjust the nozzle and spure relative place and radius connection situation.Can put a paper between them to check the match situation.
6) Start empty shoot and running,to check whether normal.
Sino mould professional in making various injection mould and for each mould assemble and the installation on injection machine,we are very care and protective.For the mould maintenance,we are rich experience,If you have new enquiry or any problem,welcome here to make detail consultation.
Contact Tina
Mail:serve@sinomould.com
Phone:+8615167663781
Skype:anole-01
Today lets share with you a detail steps for the mould installation on plastic injection mould.We are professional in this field,Below is the steps:
1. Mould installation
1) Clean the mould plate locating ring and the mould installation surface dirty parts or flash.
2) Since the mould not very big,we adopt the whole sets installation method.First set two wooden plate at the machine mould installation downside.mould installation at the machine plate,Fixed side mould location ring should be set well.Then close the mould,Use the mould clamp fix the mould on the machine mould plate.Fix the moving side on the machine mould plate.
3) Adjust the mould clamp system,ensure the enough mould open distance and the clamp force,keep suitable mould close state.
4) Slow to open the mould plate until the mould plate stop moving back,adjust the eject device,keep the eject distance.Open mould to check the eject structure moving situation,whether balance or stable.
5) After mould installation,wait the injection machine barrel and nozzle reach to 20-30℃,adjust the nozzle and spure relative place and radius connection situation.Can put a paper between them to check the match situation.
6) Start empty shoot and running,to check whether normal.
Sino mould professional in making various injection mould and for each mould assemble and the installation on injection machine,we are very care and protective.For the mould maintenance,we are rich experience,If you have new enquiry or any problem,welcome here to make detail consultation.
Contact Tina
Mail:serve@sinomould.com
Phone:+8615167663781
Skype:anole-01
2015年8月17日星期一
Pallet project building exportation|Plastic pallet mould manufacture-sinomould
One-stop plastic injection moulding service detail:Sino holdings group offers turnkey project whole set service.For the pallet project,before make the investment,customer should do a detail and correct market survey for the sales,promotion and material etc field.Since pallet project not a small one,when you plan to make the investment,you should consider detail for all the risk and your reward.Anyway,sino mould will stand with you together,our team will help you analysis all the detail your consider,we will do our best support best suggestion.
Mould description:
Mould name: Plastic pallet mould
Pallet size:1200*1000*150mm
Mould size:1800*1600*1150mm
Plastic material:PE
Number of mold cavity: 1 cavities
Injection form: 20 tio hot runner runner
Cycle time: 200 seconds/cavity
Ejection way: Ejector pin
Mould life: 500K shot
Mould core and cavity material: P20
Machine:DKM2600 servo motor injection machine
Thank you very much willing to trust sino,we will help you build a perfect and reasonable project whole line moulds,machines and factory,also will help engineer training,machine management and project detail distribution.
Written by Tina
Mail:serve@sinomould.com
Mould description:
Mould name: Plastic pallet mould
Pallet size:1200*1000*150mm
Mould size:1800*1600*1150mm
Plastic material:PE
Number of mold cavity: 1 cavities
Injection form: 20 tio hot runner runner
Cycle time: 200 seconds/cavity
Ejection way: Ejector pin
Mould life: 500K shot
Mould core and cavity material: P20
Machine:DKM2600 servo motor injection machine
Thank you very much willing to trust sino,we will help you build a perfect and reasonable project whole line moulds,machines and factory,also will help engineer training,machine management and project detail distribution.
Written by Tina
Mail:serve@sinomould.com
订阅:
博文 (Atom)



